Luxury Prefabricated Steel Structure Shopping Mall Free Designs
Product Description
Steel structure building is made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.Steel structure shopping mall is also called steel frame building, steel structure supermarket,steel structure commercial building,using a combination of metal construction and pre-fabricated components.
Characteristics of steel structure shopping mall:
1. Better margins can be achieved from the low total cost of building (less machine, fast assembly--labor and time saving, and transport cost saving), especially comparing with traditional method.
2. Good-looking, diversified color options, fashionable and unique.
3. Simple, convenient and fast installation.
4. Low repair and maintenance costs.
5. High-strength, windproof and reliable load-bearing steel structures.
6. Excellent water resistance and drainage.
7. Highly anticorrosion and dustproof.
8. Eco-friendly - highly recyclable and s minimal raw material waste.
Company profile:
Qingdao Qianchengxin Construction Technology Co, Ltd. was established in 2014. lt is a high-tech, diversified and export-oriented large-scale international private enterprise integrating R&D, design, production, installation and construction at home and abroad, and technical services.
Qian Chengxin has the qualification certificate of China's overseas contracted project management issued by the Ministry of Commerce of China, CE certification [EN1090 certificatel), ISO9001 certificate, etc, and has carried out long-term cooperation with countries along the "Belt and Road". The current products and construction services have been exported to more than 50 countries around the world, including Asia, Africa, North and South America. ln addition. branches have been established in Mozambigue and Angola, which can undertake steel structure installation projects in Africa
Production process:
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
FAQ
Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.
Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.
Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.
Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.
Contact us for design
We have professional designers who can provide you with free design solutions according to your requirements. So, if you have any needs, you can contact us at any time.