Galvanized Steel Structure Workshop Steel Frame Prefab Industrial GB
The Details of This Steel Structure Workshop Building
Material: main frame Q355B steel,secondary frame Q235 steel
Area: 1200 ㎡,parts of the building up to 7 stories
Surface treatment: all the members in hot-dip galvanized
Wall: 0.5mm metal sheet
Roof: 0.5mm metal sheet
Galvanized roof and wall purline
Door: rolling shutter door and sliding door
Windows: aluminum window
Advantages of steel construction
Prefab steel Structure workshop buildings are used for industrial production in which all steel structures are painted and then delivered to the project site for installation.
And because the steel structure can be manufactured in the factory and installed on-site, the construction time is significantly reduced. Due to the steel it can dramatically reduce construction waste and is more environmentally friendly. Therefore, it widely used in industrial buildings and civil buildings.
Our company
QINGDAO QIANCHENGXIN CONSTRUCTION TECHNOLOGY CO., LTD-The headquarter is located in the beautiful coastal city - Qingdao, China.The city where we are located has Qingdao port with a fully automated terminal, which is convenient for the sea transportation of goods.
Our factory has multiple production lines, equipped with steel cutting, shot blasting, stamping, bending, welding, forming equipment. The technology and equipment are advanced, and the steel structure is of good quality and durable.
Possess the foreign contracted project management qualification certificate issued by the Ministry of Commerce of China, CE certification [EN1090 certificate], IS09001 certificate, etc.
PRODUCTION CAPACITY :
Our company:QINGDAO QIANCHENGXIN CONSTRUCTION TECHNOLOGY CO., LTD
The company has:
2 composite board production lines
|
more than 1 million meters/year |
5 color steel plate production lines
|
2 million meters/year |
2 H-type steel CNC production lines
|
20000 tons/year |
1 C-type steel production line
|
2500 tons/year |
1 Z-steel production line
|
2,000 tons/year |
Transport of goods
Description
|
|
1 |
All of the steel columns&beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
|
2 |
To make the loading and unloading more efficient and save the delivery cost, 40' HC is preferred for loading the steel frames.
|
3 |
All the wall&roof panels will be filmed by two sides and fixed stably in the 40' HC container.
|
4 |
All the windows and doors will be protected by bubble-rapping papers and fixed stably in the container.
|
FAQ:
Q: Do you accept container loading inspections?
A: You are welcome to send an inspector, not only for the container loading but any time during the production time.
Q: Do you offer designing service for us?
A: Yes, we could design full solution drawings to your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.
Q: What is the delivery time?
A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.
Q: How long can the space frame be used?
A: The useful life of the main structure is the designed used life, which is 50-100 years (standard request of GB).
Q: Can you send engineers or the whole team to install my project?
A: We will give detailed installation drawings and videos for free. We could dispatch installation engineers as installation directors or a team upon request.