Send Message

Customized Prefabricated Steel Construction for Modern Buildings

customization
MOQ
$35-$65 per sqm
Price
Customized Prefabricated Steel Construction for Modern Buildings
Features Gallery Product Description Request A Quote
Features
Specifications
Floor: Floor Deck +Concrete
Structure: Steel Portal Frame
Design: Modern
Surface Treatment: Galvanized
Roof: Sloped
Size: Customized
Doors: KFC Door/ Steel Door/ PVC Door
Foundation: Concrete
High Light:

Customized Prefabricated Steel Construction

,

Sloped Roof Prefabricated Steel Construction

,

Customized Q235B Prefabricated Steel Building

Basic Infomation
Place of Origin: China
Brand Name: QCX
Certification: CE/ ISO9001
Model Number: Prefabricated steel building
Payment & Shipping Terms
Packaging Details: According to packinglist
Delivery Time: 45 days
Payment Terms: TT, L/C
Supply Ability: 3500 tons per month
Product Description

Product Description:

Prefabricated Steel Building

This product overview will introduce the key features and benefits of the Prefabricated Steel Building, a customizable and practical solution for multi-storey office and administrative buildings.

Size: Customized

The Prefabricated Steel Building is available in custom sizes to meet the specific needs and requirements of each project. Whether it's a small office building or a large administrative complex, we can provide a tailored solution to fit the desired size and layout.

Roof: Sloped

The roof of the Prefabricated Steel Building is designed with a sloped structure, providing efficient drainage and ensuring the building is able to withstand heavy rain and snow loads. This also allows for easy installation of solar panels or other energy-saving features on the roof.

Material: Q355B/ Q235B Steel

The Prefabricated Steel Building is made of high-quality Q355B/ Q235B steel, known for its strength, durability, and resistance to corrosion. This ensures the building is able to withstand harsh weather conditions and maintain its structural integrity for many years to come.

Wall: Insulated

The walls of the Prefabricated Steel Building are insulated, providing energy efficiency and a comfortable indoor environment. This also helps to reduce noise levels, making it an ideal choice for office and administrative buildings located in busy areas.

Foundation: Concrete

The foundation of the Prefabricated Steel Building is made of concrete, providing a strong and stable base for the entire structure. This ensures the building is able to withstand various environmental factors, such as earthquakes, and maintain its structural integrity over time.

Customized Prefabricated Steel Construction for Modern Buildings 0

Design Strength:

We have our own design team which can provide customized design. It can also produce series of steel structure products with different structures and specifications.

Customized Prefabricated Steel Construction for Modern Buildings 1

Technical Parameters:

Design Modern
Color Customized
Wall Insulated
Floor Floor Deck + Concrete
Structure Steel Portal Frame
Size Customized
Windows Aluminum
Material Q355B/ Q235B Steel
Roof Sloped
Surface Treatment Galvanized
Key Features Multi storey, commercial steel building, long span

Three main factors are affecting the cost of steel structure building.

1). Raw Material

Steel and sheet are the main components of the steel buildings, accounting for about 70%-80% of the total cost of the building. The fluctuation of the market price of steel structure raw materials directly affects the value of the building. The different section sizes, steel grade, thickness of the wall, and roof will cause the difference in price. So the raw materials are the main factor that affected the cost of steel workshop building.

2). Design Factor affected the cost of Steel Structure Workshop

Design factor: Reasonable design can save raw materials and affect the cost of the steel structure workshop. Different design plans are an essential factor for influencing the quantity of steel, directly affecting the total cost.

The foundation cost is closely related to the geology of the building. The construction period of the foundation accounts for about 25% of the total construction period. The foundation construction cost is 15% of the total cost of the metal building. When designing, we should pay attention to the geological report of the location of the building, choose a reasonable primary type, and control the base surface and depth of the foundation to play a decisive role in the total cost.

3). Construction factor

The construction time is also part of the cost. The proficiency of the installation technology is the primary factory for the construction period. The construction of the steel structure workshop is a systematic project involving a wide range of factors and many influencing factors. The construction period, policy changes, and large amounts of engineering can all affect the cost of the workshop. Have an efficient and skilled installation team can save the owner a lot of time and expense!



 

Packing and Shipping:

Customized Prefabricated Steel Construction for Modern Buildings 2

FAQ:

  • Q: What is the brand name of this product?
    A: The brand name of this product is QCX.
  • Q: What is the model number of this product?
    A: The model number of this product is Prefabricated steel building.
  • Q: Where is this product manufactured?
    A: This product is manufactured in China.
  • Q: Does this product have any certifications?
    A: Yes, this product is CE and ISO9001 certified.
  • Q: What is the minimum order quantity for this product?
    A: The minimum order quantity for this product is customization.
Recommended Products
Get in touch with us
Tel : +86 13969609102
Fax : 86-532-8389-7722
Characters Remaining(20/3000)