Project information:
Project location: Indonesia
Area:20,000 sqm
Time:2022
Main materials:
Main steel frame | Welded H section steel beam and comlumns, painted or galvanized |
Secondary frame | Galvanized C/Z purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel | Steel color sheet |
Wall panel | Corrugated Steel Color Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Water downpipe | PVC pipe |
Door | Aluminium alloy shutter door |
Windows | Aluminum alloy push-pull window |
1.Short construction period
All the components are already fabricated inside the factory, they only need to be connected together by bolts and nuts, or slightly welded, compare with traditional brick and concrete buildings, the steel prefabricated building will save at least 70% on the construction period.
2.Light weight
Compared with concrete and wood, steel structure has lighter weight and higher strength, which can greatly reduce the foundation cost. So it will show better on the seismic area.
3.Environmental protect
In line with the national sustainable development strategy, low carbon, green, environmental protection, energy-saving, etc. are the industries supported by the state
4.Application of steel structure building
The steel structure is no stranger to us. In every corner of our life, as long as you pay a little attention, there will be steel structure buildings, such as warehouses, factories, dormitories, and so on.
Compared with traditional concrete, steel structure has obvious advantages in the construction period, energy-saving, and earthquake resistance. As a green and low-carbon building, it is in line with the current environmental protection concept.
Production processing: