Durable Industrial Steel Structure Workshop Factory Building Bending
The Introduction of This Steel Structure Workshop Building
Factory mechanized production of steel structure components finished products of high precision, high production efficiency, site assembly speed, short construction period.
Component | Description |
---|---|
Steel Columns | Vertical load-bearing members that support the weight of the structure and transfer loads to the foundation. |
Steel Beams | Horizontal load-bearing members that distribute the weight from the roof and upper floors to the columns. |
Roofing and Wall Panels | Steel sheets used to cover and enclose the workshop, providing weather protection and insulation. |
Insulation | Material used between panels to regulate temperature, control sound, and enhance energy efficiency. |
Sliding Doors | Doors that operate by sliding horizontally along tracks, offering easy access and space-saving benefits. |
Windows | Fixed or operable openings in walls, providing natural light, ventilation, and visibility. |
Foundation | The base that supports the entire structure, usually made of concrete, which the columns are anchored to for stability. |
Ventilation Systems | Mechanisms for air exchange and proper airflow, essential for maintaining a comfortable and safe working environment. |
Advantages of steel construction
Prefab steel Structure warehouse buildings are used for industrial production in which all steel structures are painted and then delivered to the project site for installation.
And because the steel structure can be manufactured in the factory and installed on-site, the construction time is significantly reduced. Due to the steel it can dramatically reduce construction waste and is more environmentally friendly. Therefore, it widely used in industrial buildings and civil buildings.
Our company
1. Experienced in Steel Structure Industry:
Established in 2014, Qingdao Qianchengxin is a high-tech, diversified and export-oriented largescale international private enterprise, integrating R&D, design, production, installation and construction at home and abroad, and technical services.
It has the qualification certificate of overseas contracted project management issued by the Ministry of Commerce of China, CE certification [EN1090 certificate], 1S09001 certificate, etc, and has long-term cooperation with countries along the" Belt and Road".
The products and construction services have been exported to more than 50 countries around the world, including Asia, Africa, North and South America. In addition, branches have been established in Mozambique and Angola, which can carry out steel structure installation work in Africa.
2. Equipment and Professional Production Line:
The company can produce more than 30 kinds of series products with different structures and specifications. It has complete processing and manufacturing equipment and strong installation capabilities. It can supply a full set of materials required for steel structure construction products, and provide all installation services and technical consultation.
The company has:
2 composite board production lines
|
more than 1 million meters/year |
5 color steel plate production lines
|
2 million meters/year |
2 H-type steel CNC production lines
|
20000 tons/year |
1 C-type steel production line
|
2500 tons/year |
1 Z-steel production line
|
2,000 tons/year |
3.Design and Management Ability:
We engineers they are familiar with the all kinds of steel structure design and all the detailed drawings. Our engineer team is a very experienced and efficient team. They understand customer’s requirements and giving the accurately design to save the client’s time.
4. We provide professional installation team and we also can send our engineer in installation guidance service.
5.Transport of goods
Description |
|
1 | All of the steel columns&beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment. |
2 | To make the loading and unloading more efficient and save the delivery cost, 40' HC is preferred for loading the steel frames. |
3 | All the wall&roof panels will be filmed by two sides and fixed stably in the 40' HC container. |
4 | All the windows and doors will be protected by bubble-rapping papers and fixed stably in the container. |